Playground

The new northeast playground at Wayside Elementary has opened. The fenced and secure playground includes a basketball court, big toy, swings, and soccer area.

Drone view

There is also separate and fenced continuous access along the north end of the campus between Loris Lane/Jefferson Place and the Pathfinder Parkway.

Soccer area

The soccer area has been sodded and overseeded with rye grass. Currently that is being watered, and the area will hopefully be available for student use in late October 2024.

This project wraps up the major expansion and renovations at Wayside that were funded by the 2023 bond issue.