Hoover

Built in 1959

Hoover Building

Hoover was built on a 70-acre school site south of Sooner Park which was purchased in 1958 for $55,000. The acreage was also used for the original Madison Middle School and Sooner High; the latter later became Bartlesville Mid-High and eventually the new home for Madison.

Hoover itself originally cost $181,568 and a 1961 addition was built for $162,666. The school was designed for 250 students but had 400 students by the 1990s, using a multitude of portable buildings.

A 1993 bond issue provided $2,779,087 for several new classrooms as well as a new library, computer and science labs, cafeteria, and gymnasium. A new roof and parking area were also included, as well as a drainage system to alleviate the effects of a stream running through the site. A phone system upgrade occurred in 2000. A secure entrance was constructed in the summer of 2013, along with resurfacing of a parking lot.

In 2017 the interior finishes were reworked and new exterior panels installed on the gymnasium.

Years

Principal

1959-1968

Vernon Wilbur Siffing

1968-1971

Paul V. Davis

1971-1975

Rodrick P. Wilson

1975-1978

Daniel S. Brock

1978-1982

James Wilhite

1982-1985

David B. Boone

1985-1988

Daniel S. Brock

1988-1998

Michael P. Lamb

1998-2007

Dianne Martinez

2007-2008

Jerri Moore

2008-2012

Susan Rene Beisley

2012-2022

Susan Rene Burns

2022-

Tiffany Holmes

Hoover before the 1993 remodel

Hoover before the 1993 remodel

Hoover 1974

Hoover in 1974

Hoover in 1997 after the big remodel

Hoover in 1997 after the big remodel

Hoover gym facade and main entrance in 2017

Hoover gym facade and main entrance in 2017