Hoover
Built in 1959
![Hoover Building](https://cmsv2-assets.apptegy.net/uploads/5047/file/20131/191be5e0-741f-4af9-abd0-84ec1d69015c.jpeg)
Hoover was built on a 70-acre school site south of Sooner Park which was purchased in 1958 for $55,000. The acreage was also used for the original Madison Middle School and Sooner High; the latter later became Bartlesville Mid-High and eventually the new home for Madison.
Hoover itself originally cost $181,568 and a 1961 addition was built for $162,666. The school was designed for 250 students but had 400 students by the 1990s, using a multitude of portable buildings.
A 1993 bond issue provided $2,779,087 for several new classrooms as well as a new library, computer and science labs, cafeteria, and gymnasium. A new roof and parking area were also included, as well as a drainage system to alleviate the effects of a stream running through the site. A phone system upgrade occurred in 2000. A secure entrance was constructed in the summer of 2013, along with resurfacing of a parking lot.
In 2017 the interior finishes were reworked and new exterior panels installed on the gymnasium.
![Hoover before the 1993 remodel](https://cmsv2-assets.apptegy.net/uploads/5047/file/20132/993499aa-0e14-45ed-b57f-9d3353a7ef3e.jpeg)
Hoover before the 1993 remodel
![Hoover 1974](https://cmsv2-assets.apptegy.net/uploads/5047/file/1884586/095ae705-89ec-4ec5-864a-71e26add6ba5.jpeg)
Hoover in 1974
![Hoover in 1997 after the big remodel](https://cmsv2-assets.apptegy.net/uploads/5047/file/20133/c153adc0-673a-40cc-b672-73cc8960cba2.jpeg)
Hoover in 1997 after the big remodel
![Hoover gym facade and main entrance in 2017](https://cmsv2-assets.apptegy.net/uploads/5047/file/20134/8c9e7cb2-e2f2-4ca7-84b0-6bce8ec926c8.jpeg)
Hoover gym facade and main entrance in 2017