1994
The former Hillcrest 66 gas station at the southwest corner of Hillcrest Drive and 18th Street was razed and turned into student parking.
1995
General renovations costing $1,169,317 were performed. The north, south, and west exterior walls were repainted and given new windows. The 1968 gymnasium addition's exterior walls were given a new sheathing. The roof was repaired, and many classrooms were repainted and received lighting and climate control upgrades.
1996
Handicapped access was added to top floor of the annex by constructing a hallway ramp atop the east side of the auditorium balcony. In 2008 the entire balcony would be remodeled into a conference room, linking hallway, and storage room.
1997
The library annex, which was originally the school's cafeteria and study hall across the hall from the original library, was partitioned to form classrooms and other areas. Sinks were added to one of the chemistry labs.
1998
Bond issue passed to renovate the stadium exterior and boiler and repaint its interior as well as repaint the east side of the main building.
1999
The east exterior of the buildings were repainted. A fume hood and gas outlets were added to one annex science lab. The grass football field was recrowned and the practice field was resodded.